Project

Feasibility Studty Design Construction/Improvement and Black Topping of Thakot Banna Road Via Kar Kally Koz Cheena in District Battagram ADP No.1251/170175 (2017-2018)

Client name

C & W Division Battagram

Project Cost

Rs. 2.5(M)/335.303(M)

Description

This Project is Implemented Though Annual Development Program ADP 2017-18 of Govt Khyber Pakhtunkhwa. The Scope of Project Includes Feasibility Study, Detail Survey and Detail Designing. The Road located at Thakot Banna Road Via Kar Kally Koz Cheena in District Battagram, KPK.

The scope of services includes Reconnaissance Survey, Topographic Survey, Riverine Survey, Traffic Survey, Soil Investigation, Material Survey, Alignment Study, Hydraulic Study, Traffic Study, Feasibility Study, Establishment of Design Criteria / Standards and Design of road ,  Road Design and other Structures (structural and Geometrics ), Approach roads ( structural and Geometrics ), Pavement Design, Drainage , Tender documents & BOQ, Engineers Estimates , PC-I & Feasibility Study (including economic analysis), Land acquisition utilities / infrastructure folder, Construction Drawings and Development of TOR for Hydraulic Model study.