Project

Feasibility/Design of Oughday (Takhta Band) to Kabal Bridge and Ningolay ot Allahabad Bridge District Swat ADP no.1009/180622(2018-19)

Client name

C & W Highway Division Swat

Project Cost

Rs.1.683(M)/4303.024(M)

Description

This Project is Implemented Though Annual Development Program ADP 2018-19 of Govt Khyber Pakhtunkhwa. The Scope of Project Includes Feasibility Study, Detail Survey and Detail Designing. The project is required, Feasibility/Design of Oughday (Takhta Band) to Kabal Bridge and Ningolay to Allahabad Bridge District Swat KPK.

The scope of services includes Reconnaissance Survey, Topographic Survey, Riverine Survey, Traffic Survey, Soil Investigation, Material Survey, Alignment Study, Hydraulic Study, Traffic Study, Feasibility Study, Establishment of Design Criteria / Standards and Design of road , Road Design and other Structures (structural and Geometrics ), Approach roads ( structural and Geometrics ), Pavement Design, Drainage , Tender documents & BOQ, Engineers Estimates , PC-I & Feasibility Study (including economic analysis), Land acquisition utilities / infrastructure folder, Construction Drawings and Development of TOR for Hydraulic Model study.